
Triple M succeeded in Pull-out Test, ERT and TRT Tests at Kom ombo ACWA Power 200 Mega Watt for Mahindra EPC of the project.
On the same scope, delivering the Final Related Reports for the Tests Successfully.
On the same scope, delivering the Final Related Reports for the Tests Successfully.